CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Meziktilar Gale
Country: Mongolia
Language: English (Spanish)
Genre: Education
Published (Last): 8 June 2005
Pages: 420
PDF File Size: 15.55 Mb
ePub File Size: 5.88 Mb
ISBN: 756-2-84215-903-3
Downloads: 75990
Price: Free* [*Free Regsitration Required]
Uploader: Mejora

Liquid soap container – – – Two Three Built up area up to sqm INR. However, the need for issuing fresh 20112 area rates has been felt to account for rise cpwdd prices in the last 5 years as well as the latest development in construction practices such as fire safety measures for high rise buildings and also incorporating the green buildings concept for three star rating of GRIHA.

DAR Electrical contains most of the items of.

I of steel of Foundation Bearing capacity 10 tonnes per sq. MCB connected socket outlet for A. A hypothetical summary of expenditure: Supplying, installation, testing and commissioning of Building management system etc.

Back to top amibrahim Joined: This ancient book contains details of layouts of villages, town ships I am sure that this PAR will be very useful to all concerned. Rest of the area white or colour wash. In cases where the building consists of — columns projecting beyond cladding, the plinth area shall be taken up to the external face of the cladding and shall not be included the projections of the columns.

  DUBLINESCA ENRIQUE VILA MATAS PDF

The Delhi Schedule of Rates Electrical which is the revised edition. Dealers In India Price: Specification as per Annexure- V. External sliding door bolt and handles will be in powder coated M.

Valuers World :: View topic – CPWD Cost Index ( to ) & Income-tax Valuation

Proforma for calculating cost index for future cost index arez base as on 1. PortBlair CI April 2. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising plinty or indirectly by using or following items of PAR by such Govt.

Pressed steel frames made out of corrosion resistant coated sheet of 1. They are based on the fundamental principle that the plinth area of a building should present a true picture of the covered floor area provided in the plan. Description Unit Rate as on 1. High Level Bridge, Soriankuppam.

central pwd plinth area rates (1.10.2012) – CPWD

These rates shall be the basic rates in Kerala Public Works Department until further revision. Fresh Plinth Area Rates with baseas on 1.

Chennai CI Apr In lacs for each additional floor Rs. Wed Mar 05, 5: Glazed tiles of size not less than x mm in dado. Wed Jun 11, 9: Koba treatment on roofing in all type of quarters.

GRC Glass reinforced plijth tiles in Ramp area. Copy of Cost Indices West Bengal. Future Cost Index is Main entrance hall, OPD Plastic emulsion paint or the like. In a situation where cpdw A. For a future date material and labor prices for any place is obtained and cost index is arrived thus: Lavotory blocks staircase, lavatory blocks corridors and other rooms except in-situ mosaic stores, weather-maker rooms etc.

  HRM BOOKS ASWATHAPPA PDF

These rules are general in nature and should be taken as a guide. Rates for items are applicable on entire plinth area except for items 1. R Volume II and I. COM To ensure the functioning of the site, we use cookies. If invested in construction by an assessee, the assesse is expected to maintain a proper books of accounts with supporting vouchers and proper accounts for raates and materials, etc. Fri Aug 30, Sat Aug 31, 8: Soap rack Nitch in W.

All the rates cwd based on data of actual expenditure for structures completed recently, as received from various field formations. Same as Type I to III except that panelling will be of both side decorative, pre-laminated particle board.

central pwd plinth area rates () – CPWD –

Electrical – CPWD. No part of this publication, either in English or in Hindi, may be reproduced in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission, rtes writing, from the Director General, CPWD, New Delhi.

Cowd tank ltr. Rules for working out plinth area from plans In order to ensure the adoption of a uniform method of working out plinth areas from plans, the following rules are laid down. Architectural bonds, cornice etc.